Cortex street closure update: March 20 – 31

Cortex Street Closure Update: March 20th to March 31st

Ameren is scheduled to install conduit in the Clayton/Sarah intersection. During this portion of the job, shutting down the intersection will be required. The expected time for the intersection to be shut down is less than 2 weeks.

After the intersection portion is complete, Ameren will continue to install conduit on Clayton going West of Sarah all the way up to BJC commons. They shouldn’t need to close that entire section of road, but it will require at least 1 lane to be shut down. Ameren will have street signs up and use Flaggers as needed.

If you have specific questions, please direct them to myself or Joe Martin.

Joe Martin   Ameren, Supervisor Electric Operations, Underground District

C 314-393-5577   

Thank you,

Colleen Autry (She, Her)| Vice President of District Operations